Energy & Thermal Renovation

Electrical

Three deliverables in one: NF C 15-100-compliant board, controlled low-voltage runs, connected smart-home — all eligible for grants.

What is this service?

Distribution board refit with 30 mA type AC and A RCDs, full NF C 15-100 retrofit, RJ45 grade-3 pre-wiring, KNX or Loxone integration, IRVE EV chargers up to 22 kW. Refectis is RGE Electrical-certified — Vahan triggers CEE and MaPrimeRénov' on eligible items (chargers, smart control), and the mandatory Consuel sign-off is obtained at completion.

Your Refectis trio

Three partners for a profitable retrofit

On an energy retrofit, payback depends as much on installation quality as on funding. Our trio combines both to maximise your return on investment.

Material sourcing

Grigorian Argos

Insulation, heat pumps, joinery — negotiated at factory price. Import margins land in your quote, out of competitors' reach.

Financial grants

Margaryan Vahan

Files your MaPrimeRénov', CEE and éco-PTZ applications in full — up to 90% of the works funded. No paperwork on your side.

Execution quality

GALSTYAN Greg

Supervises installation to kill thermal bridges and deliver the performance stated on your RGE declaration.

For whom?

Individuals

  • Single-family homes
  • Apartments
  • Personalised advice

Co-ownerships

  • AGM-approved works
  • Syndic coordination
  • Bylaws compliance

Commercial

  • Offices, retail, hotels
  • Occupied-site works
  • Tight scheduling

Available grants

Grant

MaPrimeRénov'

Up to 90% of works covered for low-income households. Caps based on income.

Grant

CEE

Energy Saving Certificates: bonus paid by energy suppliers, stackable with MaPrimeRénov'.

Grant

Éco-PTZ

Zero-interest loan up to €50,000 to finance energy renovation, no income conditions.

Our certifications

RGE Électricité
Qualifelec

Before / After

Before[PHOTO_BA_ELECTRICITE_AVANT]
After[PHOTO_BA_ELECTRICITE_APRES]

Frequently asked questions

Lead times depend on surface and complexity. After the technical visit, Greg drafts a detailed schedule — count 2-4 weeks for a targeted job, 6-12 weeks for a full site.